
Site clearance for factory development
Extensive vegetation clearance and site preparation for a commercial development project, transforming a heavily overgrown plot into a safe, accessible site ready for the next phase of construction.
Read the case study
Site clearance — The Mere Golf Course
Cleared a designated area of the club's grounds to make way for the development of a new commercial unit.
Read the case study
Tree removal — Gorton Cemetery
Removed hazardous trees in one of the most demanding environments we work in. A cemetery is a place of remembrance, and every decision on site had to reflect that.
Read the case study
Alder Removal for Scottish Power
Sectional dismantling of two large alders beside a live carriageway, coordinated within a fixed Scottish Power shutdown window using a tracked spider lift.
Read the case study
Mature Poplar Monolith Removal
Emergency make-safe the day after wind damage brought down a major limb in a residential garden, using a tracked spider lift for controlled removal.
Read the case study
Preston Church Hazardous Trees
Removal of hazardous trees from a church site, with a temporary footpath closure to keep the public safely away during felling and dismantling.
Read the case study
Darwen Town Centre Tree Removal
Dismantling a tree damaging market cellar walls in a busy, fully cobbled pedestrian square, using a truck-mounted grab crane.
Read the case study
Trafford WWTW Site Clearance
Ecologist-supervised vegetation and tree clearance at a waste water treatment works, ahead of a major infrastructure upgrade.
Read the case study
Clearance at Wigan Park
Ecologist-supervised removal of multiple trees from a live public park, ahead of planned infrastructure upgrade works.
Read the case study
Fire Damaged Trees
Rope-access removal of a group of fire-damaged conifers standing close together in a residential garden, close to a neighbouring property.
Read the case study
Saddleworth Reservoir Waterway Clearance
Vegetation clearance along a watercourse and its embankments at a remote moorland reservoir, restoring clear access along the route.
Read the case study
M65 Road Expansion De-vegetation
Overnight verge and embankment clearance on a live motorway under full traffic management, ahead of a major road expansion.
Read the case studyGet a free, no-obligation quotation
Tell us about the job and a member of the team will be in touch shortly.













